The project “Over the ring: South” is part of an extended territorial reflection on the future of Antwerp’s ring road infrastructure. This project explores covering the ring road in strategic locations in order to create opportunities for urban connections, public space and future development. The core ambition is to (re)create a continuity in the city to repair the infrastructural rupture created by the ring road when it was introduced in the 1960s. The project area is situated along 4 km of infrastructures and includes all existing urban and landscape edges. How can covering portions of the ring road also become a tool that triggers progressive transformation of the territory?

The project of the ring is an illustration of the exceptional opportunities created by prioritizing the city of tomorrow over the infrastructures of the previous century. The future city is defined by its network of slow and public transportation systems, by collective spaces and ecological reserves, with its mixed urban developments, its nodes of metropolitan and local activities, all with respect to the greater landscape which functions as an armature for creating new spatial and visual connections.

Within the large-scale vision for the masterplan, pilot projects are strategically formulated based on their capacity to initiate a progressive transformation of the larger site. Pilot projects focus on the longitudinal continuities alongside the entire ring road, as, for example, hydrological or ecological strategies, or strategies against noise and air pollution. Other pilot projects develop spatial proposals for key points on site that can connect neighborhoods or create metropolitan nodes.

Intense dialogue with the inhabitants and community groups established project objectives and revealed the many points of view, constraints and opportunities of the site. Through workshops, site walks, presentations and individual dialogues, a critical link has been established between the design team and the site’s inhabitants and users.

  • Program / Project: ANTWERP / Over the ring South
  • Client: Dept. Mobiliteit en Openbare Werken (MOW), Flanders
  • Project management: Agence Ter (mandataire) + TVK + Arcadis + Interboro Partners + UAntwerpen + IBM + Deloitte + CB
  • Area: 500 ha
  • Date: 2017-2018
  • Location: Antwerp, Belgium
+

ANTWERP / Over the ring South